Level IV- Project Expediter Training

Level IV- Project Expediter Training

$80.00

Category:

Description

Level IV Project Expediter Training
Project Preparations
This training level includes five Modules (16-20)
encompassing four Processes (5-8)

Process #5 Initiate Site Development
Module 16 Learning Objectives
Project Initiation

Upon completion of Module 16 the learner will be able to:
identify the steps the surveyor takes to prepare for technical site visits
identify the steps the environmental consultant takes to prepare for technical site visits
explain the process used to obtain written approval for access to the property
explain the steps used to negotiate space rights agreements
describe the process for obtaining a preliminary title commitment report
explain the function of the preliminary title commitment report

Process #6 Initiate Collocation
Module 17 Learning Objectives
Collocation Application

Upon completion of Module 17 the learner will be able to:
describe the items included in the collocation application
explain the purpose of the collocation application
describe the collocation application process
describe possible modifications to antenna equipment on existing structures
explain the process of tower mapping
describe the situations that would require tower mapping
list the components of structural analysis
identify situations requiring structural analysis

Process #7  Title Insurance
Module 18 Learning Objectives
Title Insurance Commitment

Upon completion of Module 18 the learner will be able to:
explain the difference between title insurance commitment and a title insurance policy
explain the difference between ownership search and title search
explain the purpose of title insurance
describe the process for obtaining title insurance
list risks typically covered by title insurance
describe possible exclusions listed on title insurance policy
describe the functions of Schedule A and Schedule B

Process #8 Site Design
Module
19 Learning Objectives
Standard Drawings and Reports

Upon completion the learner will be able to:
define the FAA 7460 form
explain the components of the FAA 7460 form
describe the process for submitting the FAA 7460 form
identify the individuals involved in the site design
list the types of drawings included in the construction drawings
list the types of engineers involved in preparing reports for site design
identify the individual who oversees  the site design
describe the components of an antenna system
explain the purpose of the preliminary survey
explain the purpose of the final survey

Module 20 Learning Objectives
Supplemental Drawings and Reports

Upon completion the learner will be able to:
explain the difference between standard and supplemental drawings and reports
explain the function of zoning drawings
describe the project data included in zoning drawings
list the components of architectural drawings
list the components of elevation drawings
list the components of electrical drawings
describe elements for consideration in road design drawings
list the inclusions in a structural design letter
explain the role of construction contractors
explain the role of zoning drawings
list the components of a zoning drawing
explain the relationship of setbacks to site acquisition
describe situations which might require a photographic simulation
list considerations for creating an effective photographic simulation
describe situations which would require a landscaping plan
describe situations which would require a parking plan

Reviews

There are no reviews yet.

Only logged in customers who have purchased this product may leave a review.

X
Welcome to Telecom Birddogs

Terms of Service | Privacy Policy

Powered by WishList Member - Membership Software